Construction
eBook - ePub

Construction

A Practical Guide to RIBA Plan of Work 2013 Stages 4, 5 and 6 (RIBA Stage Guide)

  1. 160 pages
  2. English
  3. ePUB (mobile friendly)
  4. Available on iOS & Android
eBook - ePub

Construction

A Practical Guide to RIBA Plan of Work 2013 Stages 4, 5 and 6 (RIBA Stage Guide)

About this book

This is the third in a must-have series of step-by-step guides to using the new RIBA Plan of Work 2013 on your project. Drawing together stages 4, 5 and 6 this book explains what needs to have been achieved for Technical Design to begin, how to achieve success in the construction phase as well as the importance of a comprehensive Handover Strategy.

Providing a practical tool to running an efficient project each guide follows the same format leading you through the core tasks at each stage supported by tips, definitions, templates and useful techniques. Five theoretical scenarios are used throughout the guides to illustrate how the Plan of Work can be applied on various project types and sizes including an extension to a house, a new library and a large office building.

These guides will provide unrivalled support for practices on all projects – large and small – and across all types of procurement.

Frequently asked questions

Yes, you can cancel anytime from the Subscription tab in your account settings on the Perlego website. Your subscription will stay active until the end of your current billing period. Learn how to cancel your subscription.
At the moment all of our mobile-responsive ePub books are available to download via the app. Most of our PDFs are also available to download and we're working on making the final remaining ones downloadable now. Learn more here.
Perlego offers two plans: Essential and Complete
  • Essential is ideal for learners and professionals who enjoy exploring a wide range of subjects. Access the Essential Library with 800,000+ trusted titles and best-sellers across business, personal growth, and the humanities. Includes unlimited reading time and Standard Read Aloud voice.
  • Complete: Perfect for advanced learners and researchers needing full, unrestricted access. Unlock 1.4M+ books across hundreds of subjects, including academic and specialized titles. The Complete Plan also includes advanced features like Premium Read Aloud and Research Assistant.
Both plans are available with monthly, semester, or annual billing cycles.
We are an online textbook subscription service, where you can get access to an entire online library for less than the price of a single book per month. With over 1 million books across 1000+ topics, we’ve got you covered! Learn more here.
Look out for the read-aloud symbol on your next book to see if you can listen to it. The read-aloud tool reads text aloud for you, highlighting the text as it is being read. You can pause it, speed it up and slow it down. Learn more here.
Yes! You can use the Perlego app on both iOS or Android devices to read anytime, anywhere — even offline. Perfect for commutes or when you’re on the go.
Please note we cannot support devices running on iOS 13 and Android 7 or earlier. Learn more about using the app.
Yes, you can access Construction by Phil Holden in PDF and/or ePUB format, as well as other popular books in Architecture & Architecture General. We have over one million books available in our catalogue for you to explore.

Information

Chapter 02

Stage 4 Technical Design: Part 1

Stage 4
Technical Design
ifig0004.webp

table0001.webp

Chapter 02

Overview

Having produced a coordinated design at Stage 3, it is now time to develop the Technical Design of the building. Initially the Technical Design information will represent the design intent of the design team, and as specialist subcontractors become part of the team the details will incorporate the components and products that the building is to be constructed from. Exactly how far to take the Technical Design will depend on whether the construction on site will be based on the information produced by the design team or on the information to be developed by a specialist subcontractor. In any event it is more than likely that the architect will be active as the lead designer and asked to coordinate all of the design work, and in many instances this will mean ensuring that the information describing the building is fully representative of the final detail. To do this accurately they will need to know who is doing each activity, and when they are delivering their Technical Designs.
This chapter will explain how to get started on the Stage 4 Technical Design. It will describe what level of information needs to be provided at this stage; how to adjust the Design Responsibility Matrix, if necessary; and how to develop a Design Programme for this stage. Many of the decisions taken during Stage 4 are affected by the procurement route selected at Stage 2 or 3, and within this chapter there is an explanation of how this selection affects Stage 4.
In the next chapter we will examine in more detail the key support tasks that the project team will need to complete, and clarify what should be in the Sustainability Checkpoints and Information Exchanges at the end of Stage 4. There is also a description of the key items that the project team will need to consider during Technical Design. Whilst in practice Stages 4 and 5 will overlap for most projects, the work on an individual package or section of the design must be complete at Stage 4 before Stage 5 Construction can commence.

What is Stage 4?

The core objectives for Stage 4 are:
  • To complete the Technical Design required for all architectural, civil, structural, building services and specialist subcontractor information to be ready for construction, allowing for any overlap between Stages 4 and 5.
  • To clarify who is responsible for each and every item of the Technical Design.
  • To develop a new Design Programme in order to ensure that the stage is completed in a timely manner.
Having defined the Project Objectives during Stage 1, it is important that the technical solutions are defined in sufficient detail to ensure that those objectives can be delivered. Just as in earlier stages, it is important that the project lead continually tests the project’s development against the Quality Objectives and Project Outcomes previously developed.
Throughout Technical Design the project is developed to ensure that architectural, building services and structural engineering designs are refined to a level that will enable construction to take place. At the conclusion of Stage 4, the following will have been achieved:
  • The project team will have completed a fully integrated set of technical information sufficient for construction.
  • The cost consultant will have completed an updated construction cost estimate that is fully integrated with the Technical Design information.
  • The specialist subcontractors will have completed their design, and it will be integrated into the construction documentation.
  • All disciplines will have completed their technical details.
  • The Construction Strategy will have been finalised and will be understood by all.
  • Any planning conditions will have been discharged.
  • All statutory approvals required from the design team will have been secured.

ifig0002.webp
Is a Construction Cost Estimate useful at Stage 4?

The benefit of keeping the construction cost estimate up to date is that it ensures that the client is fully aware of the cost of the building before he of she goes to tender. However, it may prove more expedient under a traditional contract to replace the pre-tender estimate at Stage 4 with a real construction price for the works. Should this price prove to be in excess of previous estimates, then value-engineering studies can be undertaken with the preferred contractor to produce the optimum result.
The detail in Figure 2.1 (overleaf) illustrates:
  • The relationship between the primary structure, the structural floor, the finishes and the balustrading system.
  • That the specialist subcontractor would be expected to produce fabrication drawings for the balustrading based on the architect’s technical design intentions.
  • That the architect would be expected to provide integrated construction details for the flooring, acoustically insulated fascia and service tray, the last-named of which may be a proprietary product.

Preparing for Stage 4

Before embarking on Stage 4 it is important to ensure that the following actions have been completed:
  • The Stage 3 design has been signed off by the client.
  • The architectural, structural and building services designs have been coordinated.
  • The fee for Stage 4 has been agreed with the client (where this has not already been agreed, as recommended, at Stage 1).
  • The Information Exchanges for the stage have been clearly defined.
  • A Design Programme for the completion of the integrated Technical Design has been agreed, including the work of the specialist subcontractors.
  • The Design Responsibility Matrix has been adjusted to align with the contractor’s final position on the role of any specialist subcontractors.
  • The appropriate resources have been identified.
2.1 An example of the level of detail produced for Stage 4.
2.1 An example of the level of detail produced for Stage 4.

How do you select the level of detail to be included in the information to be exchanged at the end of Stage 4?

The level of detail to be included in the Information Exchange needs to be carefully considered. The information needs to be sufficient to describe the full scope of the works that the contractor is going to carry out. Although CAD information is produced ā€˜full size’, it is typically issued or exchanged in ā€˜hard’ (prints) or ā€˜soft’ (electronic) formats with the level of detail added to the CAD model dictated by the scale of the output (eg 1:100, 1:50, 1:5). BIM will change this approach, and whilst it is likely that 2D ā€˜slices’ through the model will continue to be used for construction purposes for some time the requirement to provide fully digital information as a means of communicating with the fabricator is already a reality. As with CAD information, it is preferable to restrict the level of detail in the model to match the purpose of the output.

ifig0002.webp
Level of Detail

On drawings that need to illustrate the fire compartmentation of a building, it will not be necessary to show the cladding extrusions of the curtain walling. The level of detail required would be commensurate with a plan produced at 1:100.
General-arrangement information will have been inherited from Stage 3. This will range in scale from 1:200 to 1:50 depending on the size of the project. It should now be enhanced to include setting-out dimensions, enabling the contractor to position all components in the building accurately. References should also be included to key components for scheduling purposes, and to larger-scale drawings. Where specialist subcontractors are going to be engaged to complete the drawings, then details only need to be prepared to show the design intent. Where there is no requirement for specialist subcontractors, the design team will need to draw the construction details at a typical scale, ranging from 1:20 to 1:5; in practice, this will be the point at which full-size details in CAD or BIM are appropriate to generate the output.
fig0002
2.2 Sketch (right) illustrating design model received in the Information Exchange at the end of Stage 3, together with the Technical Design drawing (facing page) prepared by the design team at Stage 4.
2.2 Sketch (right) illustrating design model received in the Information Exchange at the end of Stage 3, together with the Technical Design drawing (facing page) prepared by the design team at Stage 4.
The design information in Figure 2.2 (previous page) illustrates the development of a complex project facade by Pascall+Watson architects. The information shows that:
  • By the end of Stage 3 the relationship between facade, structure and roof edge has been coordinated.
  • The sizes of glass panels and the transom positions have been fixed.
  • At Stage 4 this information is conveyed at a larger scale than hitherto. Setting-out geometry is also shown on the drawing.
  • All the major components are described, and extrusion shapes and sizes for the steelwork components are illustrated.
  • The drawing is capable of enlargement ...

Table of contents

  1. Cover
  2. Title
  3. Contents
  4. Copyright
  5. Foreword
  6. Series editor’s foreword
  7. The author
  8. The series editor
  9. The scenarios
  10. The in-text boxed features
  11. The RIBA Plan of Work 2013
  12. Introduction
  13. 01 STARTING STAGES 4, 5 AND 6
  14. 02 STAGE 4 TECHNICAL DESIGN: PART 1
  15. 03 STAGE 4 TECHNICAL DESIGN: PART 2
  16. 04 STAGE 5 CONSTRUCTION
  17. 05 STAGE 6 HANDOVER AND CLOSE OUT
  18. 06 CONCLUSION
  19. Plan of Work glossary
  20. Index