Chemical and Process Plant Commissioning Handbook
eBook - ePub

Chemical and Process Plant Commissioning Handbook

A Practical Guide to Plant System and Equipment Installation and Commissioning

Martin Killcross

Compartir libro
  1. 312 páginas
  2. English
  3. ePUB (apto para móviles)
  4. Disponible en iOS y Android
eBook - ePub

Chemical and Process Plant Commissioning Handbook

A Practical Guide to Plant System and Equipment Installation and Commissioning

Martin Killcross

Detalles del libro
Vista previa del libro
Índice
Citas

Información del libro

The Chemical and Process Plant Commissioning Handbook, winner of the 2012 Basil Brennan Medal from the Institution of Chemical Engineers, is a guide to converting a newly constructed plant or equipment into a fully integrated and operational process unit. Good commissioning is based on a disciplined, systematic and proven methodology and approach that achieve results in the safest, most efficient, cost effective and timely manner.

The book is supported by detailed, proven and effective commission templates, plus extensive commissioning scenarios that enable the reader to learn the context of good commissioning practice from an experienced commissioning manager. It focuses on the critical safety assessment and inspection regimes necessary to ensure that new plants are compliant with OSHA and environmental requirements. Martin Killcross has brought together the theory of textbooks and technical information obtained from sales literature, in order to provide engineers with what they need to know before initiating talks with vendors regarding equipment selection.

  • Unique information from a respected, global commissioning manager: delivers the know-how to succeed for anyone commissioning new plant or equipment
  • Comes with online commissioning process templates that make this title a working tool kit as well as a key reference
  • Extensive examples of successful commissioning processes with step-by-step guidance enable readers to understand the function and performance of the wide range of tasks required in the commissioning process

Preguntas frecuentes

¿Cómo cancelo mi suscripción?
Simplemente, dirígete a la sección ajustes de la cuenta y haz clic en «Cancelar suscripción». Así de sencillo. Después de cancelar tu suscripción, esta permanecerá activa el tiempo restante que hayas pagado. Obtén más información aquí.
¿Cómo descargo los libros?
Por el momento, todos nuestros libros ePub adaptables a dispositivos móviles se pueden descargar a través de la aplicación. La mayor parte de nuestros PDF también se puede descargar y ya estamos trabajando para que el resto también sea descargable. Obtén más información aquí.
¿En qué se diferencian los planes de precios?
Ambos planes te permiten acceder por completo a la biblioteca y a todas las funciones de Perlego. Las únicas diferencias son el precio y el período de suscripción: con el plan anual ahorrarás en torno a un 30 % en comparación con 12 meses de un plan mensual.
¿Qué es Perlego?
Somos un servicio de suscripción de libros de texto en línea que te permite acceder a toda una biblioteca en línea por menos de lo que cuesta un libro al mes. Con más de un millón de libros sobre más de 1000 categorías, ¡tenemos todo lo que necesitas! Obtén más información aquí.
¿Perlego ofrece la función de texto a voz?
Busca el símbolo de lectura en voz alta en tu próximo libro para ver si puedes escucharlo. La herramienta de lectura en voz alta lee el texto en voz alta por ti, resaltando el texto a medida que se lee. Puedes pausarla, acelerarla y ralentizarla. Obtén más información aquí.
¿Es Chemical and Process Plant Commissioning Handbook un PDF/ePUB en línea?
Sí, puedes acceder a Chemical and Process Plant Commissioning Handbook de Martin Killcross en formato PDF o ePUB, así como a otros libros populares de Technik & Maschinenbau y Chemie- & Biochemietechnik. Tenemos más de un millón de libros disponibles en nuestro catálogo para que explores.

Información

Año
2011
ISBN
9780080971759

Chapter 1

Commissioning Phase One – Prepare

Chapter Outline

Appointing the Commissioning Manager
Attributes
Responsibilities
Qualifications
Key Points
Commissioning Scope and Contracts
The Client Commissioning Manager
Contracting Commissioning Manager (Not Client-Employed)
Contracts
Commissioning Scope and Contracts – “Things That Can Go Wrong”
Key Points
Budget Estimation
Prioritized Asset Systemization
Hypothetical Highlighted P&ID Showing System Identification
Prioritized Asset Systemization – “Things That Can Go Wrong”
Key Points
Support Design
Hazard Study
Layout Reviews
P&ID Reviews
The Process
Mechanical Issues
Control, Instrument and Electrical Issues
General Issues
3-D Model Reviews
Isometric Drawing
Risk Assessments and Hazards During Construction
Control Systems
Action Upon Alarm Review
Support Design – “Things That Can Go Wrong”
Key Points
Develop an Initial Commissioning Plan or Philosophy
Table of Contents
Purpose of the Commissioning Plan
Commissioning Overview
Project Scope of Work
Key Project Objectives and Aims
Commissioning Team Roles
Commissioning Methodology
Initial Commissioning Systems
The Commissioning System File
Commissioning and Start-up Challenges
Appointment, Composition of the Commissioning Team, Roles, Responsibilities and Organization Chart
The Commissioning Manager
Commissioning System Engineer
Control/Electrical/Instrumentation Commissioning Engineer
Mechanical Commissioning Engineer
Standard Operating Procedure Group – If Not in Scope of the Commissioning Engineer
Training Group – If Not in Scope of the Commissioning Engineer
Key Points
Documentation and Sign-Off Requirements, the Library and Electronic Filing
Documentation Sign-Off
Key Points
Devise Assignment Details, Site and Office Requirements, Consumables and Procure Commissioning Chemicals
International Assignment
Site and Office Requirements
General Commissioning Consumables
List and Procure Commissioning Chemicals
Key Points
Create Commissioning Documents and the System File
Commissioning Documents
The Commissioning System File
Table of Contents
Create Commissioning Documents and the System File – “Things That Can go Wrong”
Key Points
Control, Instrument, Electrical Commissioning Document Preparation
Main Electrical Installation, Switchgear, Transformers, Motor Control Centers (MCC) and Power Cables
Lighting
Control Systems (DCS and/or PLC)
Various Instrument and Electrical Cabling
Instrument Calibration and Instrument Range Consistency
Existing Equipment Sanity Check
Loop Test Paperwork Development, Checking and Testing
Motor Checking and Testing
Software Interlock and Emergency Shut-Down Testing, Both “Dry” and “Wet”
DCS/PLC Sequence Checking and Testing
Specialist Vendor Installation
Training
Control, Instrument, Electrical Commissioning Document Preparation – “Things That Can Go Wrong”
Key Points
Mechanical Commissioning Document Preparation
Isometric Drawing to P&ID Sanity Check
Pipeline Cleanliness Checks and Procedures
Construction and Installation Checks
Vessel and Equipment Checks (Off and On Site)
Mechanical Documentation Check
Vendor and Proprietary Equipment Check-Out
Lubrication
Training
Mechanical Commissioning Document Preparation – “Things That Can Go Wrong”
Key Points
Develop Training Materials
Operator Knowledge Training – Classroom
Operator Knowledge Training – Presentation
Operator Practical Training – “On The Job”
Maintenance Personnel Knowledge Training – Classroom
Maintenance and Operator Personnel Equipment-Related Training – Workshop and Classroom
Management Training – Classroom
Control System, Operator Training – Classroom with Control System Simulation
Control System, Systems Engineer Training – Typically Control System Vendor Location (Potentially Site-based)
Develop Training Materials – “Things That Can Go Wrong”
Key Points
Develop Standard Operating Procedures (SOPs)
From the Health and Safety Executive (HSE)
Status of Guidance
Operating Procedures
Title of Procedure Manua
Table of Contents
Table of Contents Descriptions
General Description of System
Safety, Health and Environmental Considerations
Pre-Start Checks
Valve Positions for Start-Up
Initial Start-Up Procedures
Normal Start-Up
Normal Operation Including Optimal Operational Values
Normal Shut-Down Procedures
Emergency Shut-Down Procedures
Fault-Finding Guide, Consequences of a Deviation and Corrective Action Plan
Loss of Utility Emergency Procedures
Temporary Operating Procedures
Action Upon Alarm Sheets
Regular System Routines
Decontamination Procedures
Re-commissioning Procedures Post a Major Overhaul or Turnaround
Key Points
Develop Commissioning Schedule
Stage 1 – Level 2
Stage 2 – Level 3
Key Points
Devise Handover Procedure
Handover Criteria
Phased System Handover Approach
Safe Systems of Work at Handover
Handover Documentation
The Review Process Prior to Handover
Devise Handover Procedure Things That Can Go Wrong
Key Points
Devise Commissioning Tagging System
Location of Tie-in Points
Location of Commissioning System Battery Limit Isolation
A Punchlist Item
Leak Point Found During Leak Test
System LIVE
Item Under Construction Control – Refers to an Electrical Item
Item Under Commissioning Control – Refers to an Electrical Item
The tasks on the following bulleted list are, at a minimum, those that must be considered during the preparation phase of process plant commissioning; they are in chronological order and consistent with the required flow of activities during this initial phase.
Appointing the commissioning manager
Commissioning scope and contracts
Budget estimation
Prioritized asset systemization
Support design
Develop an initial commissioning plan or philosophy
Appointment and composition of the commissioning team, roles, responsibilities and organization chart
Documentation and sign-off requirements, the library and electronic filing
Devise assignment details, site and office requirements, consumables and procure commissioning chemicals
Create commissioning documents and the system file
Control, instrument, electrical commissioning document preparation
Mechanical commissioning document preparation
Develop training materials
Develop Standard Operating Procedures
Develop Commissioning Schedule
Devise handover procedure
Devise commissioning tagging system.

Appointing the Commissioning Manager

Po...