Currently in its third edition, the NEC suite has become one of the UK's leading families of standard forms of contract for major construction and civil engineering projects. Part of the NEC suite, the Professional Services Contract (PSC) was drafted with the same process-based approach and objectives, offering a standard contract for the appointment of consultants providing professional services in an engineering or construction project. Embodying best practice in terms of project management, the basic philosophy of the PSC differs from the principles and approach of other standard contracts used to appoint consultants.

This book is a practical guide to the application of the PSC. Starting with a brief discussion of the background and philosophy behind the PSC, it identifies the roles and responsibilities of each of the named functions within the contract, explains the approaches required to achieve a successful working relationship between all parties, and examines all the procedures in the PSC. The book explains the links between the various sections of the contract to assist the reader with cross referencing, and covers all the variations created by the Main and Secondary Options. As a very practical guide it will aid users in the transition from their use and understanding of the other standard contracts to the collaborative project management-based approach of the PSC.

Written for anyone working in the construction and related industries using the PSC to procure or provide consultancy services in relation to a construction project, it will be of interest to the complete construction supply chain, particularly architects, structural engineers, services (M&E) engineers, civil engineers, quantity surveyors and interior designers, together with Contractors and Sub-Contractors who have a design liability and employ consultants to assist them. It will also be of interest to consultants and lawyers advising any of these parties, either in the preparation of contract documentation or the resolution of problem situations which may arise.

Frequently asked questions

How do I cancel my subscription?
Simply head over to the account section in settings and click on “Cancel Subscription” - it’s as simple as that. After you cancel, your membership will stay active for the remainder of the time you’ve paid for. Learn more here.
Can/how do I download books?
At the moment all of our mobile-responsive ePub books are available to download via the app. Most of our PDFs are also available to download and we're working on making the final remaining ones downloadable now. Learn more here.
What is the difference between the pricing plans?
Both plans give you full access to the library and all of Perlego’s features. The only differences are the price and subscription period: With the annual plan you’ll save around 30% compared to 12 months on the monthly plan.
What is Perlego?
We are an online textbook subscription service, where you can get access to an entire online library for less than the price of a single book per month. With over 1 million books across 1000+ topics, we’ve got you covered! Learn more here.
Do you support text-to-speech?
Look out for the read-aloud symbol on your next book to see if you can listen to it. The read-aloud tool reads text aloud for you, highlighting the text as it is being read. You can pause it, speed it up and slow it down. Learn more here.
Is Practical Guide to the NEC3 Professional Services Contract an online PDF/ePUB?
Yes, you can access Practical Guide to the NEC3 Professional Services Contract by Michael Rowlinson in PDF and/or ePUB format, as well as other popular books in Droit & Droit de la construction. We have over one million books available in our catalogue for you to explore.

Information

Year
2012
ISBN
9781118406403
Edition
1
Topic
Droit

Chapter 1

Introduction

1.1 General

In writing this guide I have set out to provide a view, much of it personal, as to how to get the most out of the 3rd edition of the New Engineering Contract Professional Services Contract (NEC Panel, 2005a). It is no secret that I am a fan of the family of contracts that the PSC is a member of and, as a result, may be willing to overlook what many perceive as faults or weaknesses. In this guide I have tried to identify and suggest ways in which the procedures and aims of the Professional Services Contract can be simplified so that users do not become unnecessarily bogged down in procedure, but instead concentrate on achieving the goals of the PSC. This guide therefore goes through the procedure in detail as intended by the relevant clauses, but concentrates on practical issues to provide suggestions which the parties can use to achieve the overall intent and spirit of the PSC and to reach the common goal.
With this guide, you get what it says on the cover: a practical guide to the NEC3 PSC Form of Contract. It is a guide to provide users of the PSC, both novice and experienced, with a view of all of its various philosophies, principles, mechanisms and vagaries. The reader will be guided through the contract in a manner that will enable him or her to use this guide for reference without necessarily having to read it all: in other words, a practical guide rather than a stuffy text book. That said, there will be an amount of cross-referencing between sections in order to avoid repetition; users will need to follow these references to find more detailed supporting guidance to particular issues. One area that is not cross-referenced is the term ‘spirit of mutual trust and cooperation’ as found in clause 10.1 of the PSC, although used extensively throughout the guide. If users are uncertain of the meaning of this phrase, then they need to re-read Chapter 4.
To assist the reader in finding where any particular clause, related legal case or UK statute is referred to in the text, a comprehensive index of such references is included in Tables A1.1– A1.3 in Appendix 1.
The more I have worked with this contract over the years, the more I have come to think of it not as a contract but as a Project Management Procedures Manual. This should not be a surprise as the original contract was drafted by project managers for construction professionals (and not by lawyers for other lawyers and judges). That I refer to a contract for professional services in terms of a Project Management Procedures Manual means that those professionals who may work with this contract perhaps need to consider how they manage their relationship with their employer. This approach is different to that which many professionals will be used to in respect to their own appointment. They will find it is much more closely related to construction contracts than other forms of consultancy agreements.
Nevertheless, we must not lose sight of the fact that the PSC is a contract and, as such, legally binds those parties that enter into a contract incorporating these standard terms.

1.2 Mechanics not law

Being a practical guide, this book considers the mechanics of the contract and not of the law. As a practising construction professional, I am interested in the successful outcome of the project for all parties involved at whatever level of the project supply chain. From my point of view, the employing organisation should get what it wants in terms of a project finished on time, to the required quality and within budget (providing, of course, that the budget was reasonable in the first place). The consultants should be recognised for their contribution, whether design, management or commercially orientated, and be paid a reasonable fee for the service they provide. The contractors and subcontractors who carry out the work should be allowed to work efficiently, be recognised as having contributed to the project and make a profit.
Only those projects that satisfy all of the above criteria should be considered as being successful. Every organisation, whether a company, partnership or individual who is involved in a project, has its own needs and goals from that project. A good project will recognise this simple fact of business. It is when all the parties involved recognise each other’s business goals (see Section 4.4.3) from the project, and work to align these goals, that success is achieved for all. As soon as one of the organisations involved feels dissatisfied, then the seeds of a dispute have been sown. As the industry knows, such seeds germinate easily and freely; once they appear on a project they can spread faster than any invasive weed.
Following on from the earlier editions, the PSC is drafted to impose the best practices within project management on the parties with the goal of avoiding disputes. It is the mechanics of these procedures and how to make them work effectively that is the focus of this guide.
As a consequence the guide does not consider the law in relation to the PSC except where reference is needed to explain why something is included or to confirm that, in relation to the law in the United Kingdom, those requirements have been complied with by the PSC (or not as the case may be).

1.3 A simple formula for understanding a contract

Let’s face it: all contracts are confusing when you first try to work out what it all means. I picked up a simple formula for considering contracts many years ago from an experienced Chief Quantity Surveyor of a contracting organisation, who came to my then local centre of The Chartered Institute of Building to give an evening talk on Joint Contracts Tribunal (JCT) Contracts. It didn’t matter that he was talking about JCT Contracts. What I took away from that talk was a formula which I still use today in relation to any contract or procedural document that I encounter; this formula holds good in all such situations. I still have the piece of paper on which I noted the few words I needed to remind me of what to do. I rarely look at that piece of paper now as the formula has become second nature to me in relation to every contract or set of procedures which I read.
The formula is in two parts. The first part can be remembered by four words: WHO, WHAT, WHEN and HOW.
To expand, a contract is a document which sets out the rights and obligations of the parties to that contract, no matter what the contract is for. In the construction and related industries such contracts cover (usually by necessity) a range of extensive rights and obligations for both parties, how such rights and obligations are to be administered and the involvement of agents to carry out specified duties for one or both of the parties. WHO, the first of our four key words, relates to the administration of these rights and obligations. The WHO in the PSC will be one of the four named persons including the Employer, the Employer’s Agent (if employed), the Consultant or the Adjudicator. The specific roles of these individuals are covered in detail in Sections 5.2–5.5.
By its processes and procedures, the PSC sets out WHAT must or may be done in the event that a certain circumstance arises. The WHAT will involve the WHO doing something as set out in the contract.
WHEN that something is to be done is also set out by the contract. In the case of the PSC, the timetable for WHEN these things shall be done is clear and forms a key part of the processes and procedures under the contract. Failure to comply with these processes and procedures in accordance with the requirements specified by WHEN can result in a right being forfeited because of this failure.
Finally, the PSC sets out HOW the process or procedure shall be carried out. Again the PSC is prescriptive as to the HOW, although much of the HOW is set out in general terms that apply across all of the subsequent detailed processes and procedures.
To summarise, the first part of the formula (which holds good for all contracts and not just the PSC) is to consider WHO does WHAT, WHEN they do it and HOW it is to be done. Understanding these things is important as the PSC creates what are known in legal circles as conditions precedent. Although the English Courts do not like such provisions, they can be effective if drafted in certain terms (for further comment on conditions precedent see Section 1.5 below).
When dealing with specific processes and procedures in this guide, the WHO, WHAT, WHEN and HOW will be summarised as appropriate in each case.

1.4 Mandatory or discretionary

The second part of the formula I learnt that evening was to consider whether an obligation, requirement or procedure was mandatory or discretionary. The distinction is quite clear: if something is mandatory then it must be done in order to create a right for you and/or an obligation on someone else. If something is discretionary, then the party concerned can do it if they feel it is appropriate but lose nothing if they do not.
The key to whether something is mandatory or discretionary is in the little words. If a provision says that a party ‘shall’, ‘must’ or ‘will’ do something then the requirement to do that something is mandatory; that key little word leaves that party with no other option.
On the other hand, if the provision in question says that the party ‘may’ or ‘can’ do something, then that requirement is left to the discretion of that party i.e. the action is discretionary.
Appreciating whether a requirement or a provision is mandatory or discretionary is key to making sure that you, as a party or agent to the contract, do what is required of you at the right time and in the right way.
In the PSC, and indeed every other contract in the NEC3 family together with all the previous editions, there is little to doubt or question as to whether things are mandatory or discretionary. The first clause in the PSC, clause 10.1, clearly states that the Employer and the Consultant shall act as stated in this contract. The meaning is plain and clear: they are all required to carry out the procedures set out in the contract at all times and in the way stated. There is no discretion about it, unless such discretion is given expressly in a particular clause (there are a small number of such instances which will be highlighted as they arise).

1.5 Conditions precedent

Put as simply as possible, a condition precedent is a condition which acts to prevent either a right or an obligation from coming about until such time as the event prescribed as the condition precedent occurs. If a time limit is attached to the occurrence of the event (which is a condition precedent to a right or an obligation) and the event has not occurred within the time limit stated, the right or obligation can never come about.
It is important for users of the PSC to understand this principle; part of a mechanism which is commonly used includes such a condition precedent with a time limit. This actual condition will be highlighted when it is commented on.
While the courts in the UK do not traditionally like or support such clauses, they have enforced numerous examples where the wording has been clear. The first and second editions of the PSC were said to include conditions precedent but it is generally felt that those conditions were not clearly enough worded to be effective. However, with the current edition, it is generally considered that the wording now used is almost certainly clear enough to be considered as an effective condition precedent.

1.6 Note on use of upper case in key words and phrases

Capital initial letters are used to identify terms that are defined as a feature of the PSC as set out in clause 11.1. Whenever I have referred to any such term I have maintained consistency with the PSC and followed that principle of using upper case for the first letter of defined terms throughout the text of this guide. The reader will however come across instances where the same terms are referred to in a general sense, when lower case is used. I have adopted this approach in order to distinguish between specific references to procedures, rights, obligations and other such matters which are directly linked to the PSC and more general comments about good practice, the construction industry and other non-contract-specific items.
For example, ‘Consultant’ refers to a specific issue that concerns the Consultant under the PSC and ‘consultant’ refers to the consultant in general terms.

Chapter 2

Background to the NEC Family of Contracts

2.1 The background: First editions

The timescale that we are looking at with the construction contract starts with a consultative document published in 1991 which was followed by the first edition in 1993, the second edition in 1995 and the third edition in July 2005. The first edition of the PSC was issued in 1994 (reprinted in 1996), the second edition in 1998 and the third edition in July 2005 as part of the consolidated family of contracts.
Many people believe the first edition of the construction contract was published in response to Sir Michael Latham’s (1994) report, Constructing the Team. This report was however pre-dated by both the consultative document and its first edition.
In his report Sir Michael identified the NEC (as the construction contract was then called) as being the contract which, more than any other in general circulation at the time, contained many of the provisions which he considered should be adopted in Construction Contracts. Out of the thirteen key issues which Latham thought should be adopted, the NEC contained eight. The full list of key issues from Constructing the Team is as follows:
1. ‘A specific duty for all parties to deal fairly with each other, and with their subcontractors, specialists and suppliers, in an atmosphere of mutual cooperation.
2. Firm duties of teamwork, with shared financial motivation to pursue those objectives.These should involve a general presumption to achieve “win-win” solutions to problems which may arise during the course of the project.
3. A wholly interrelated package of documents which clearly defines the roles and duties of all involved, and which is suitable for all types of project and for any procurement route.
4. Easily comprehensive language and with Guidance Notes attached.
5. Separation of the roles of contract administrator, project or lead manager and adjudicator. The Project or lead Manager should be clearly defined as the client’s representative.
6. A choice of allocation of risks, to be dec...