The definitive guide to measurement and estimating using NRM1, written by the author of NRM1

The 'RICS New rules of measurement: Order of cost estimating and cost planning of capital building works' (referred to as NRM1) is the cornerstone of good cost management of capital building works projects - enabling more effective and accurate cost advice to be given to clients and other project team members, while facilitating better cost control.

The NRM1 Cost Management Handbook is the essential guide to how to successfully interpret and apply these rules, including explanations of how to:

  • quantify building works and prepare order of cost estimates and cost plans
  • use the rules as a toolkit for risk management and procurement
  • analyse actual costs for the purpose of collecting benchmark data and preparing cost analyses
  • capture historical cost data for future order of cost estimates and elemental cost plans
  • employ the rules to aid communication
  • manage the complete 'cost management cycle'
  • use the elemental breakdown and cost structures, together with the coding system developed for NRM1, to effectively integrate cost management with Building Information Modelling (BIM).

In the NRM1 Cost Management Handbook, David Benge explains in clear terms how NRM1 is meant to be used in familiar quantity surveying tasks, as well as a range of activities of crucial importance for professionals in years to come. Worked examples, flow charts, diagrams, templates and check lists ensure readers of all levels will become confident and competent in the use of NRM1. This book is essential reading for anyone working with NRM1, and is the most authoritative guide to practice available for those preparing to join the industry.

Frequently asked questions

Yes, you can cancel anytime from the Subscription tab in your account settings on the Perlego website. Your subscription will stay active until the end of your current billing period. Learn how to cancel your subscription.
No, books cannot be downloaded as external files, such as PDFs, for use outside of Perlego. However, you can download books within the Perlego app for offline reading on mobile or tablet. Learn more here.
Perlego offers two plans: Essential and Complete
  • Essential is ideal for learners and professionals who enjoy exploring a wide range of subjects. Access the Essential Library with 800,000+ trusted titles and best-sellers across business, personal growth, and the humanities. Includes unlimited reading time and Standard Read Aloud voice.
  • Complete: Perfect for advanced learners and researchers needing full, unrestricted access. Unlock 1.4M+ books across hundreds of subjects, including academic and specialized titles. The Complete Plan also includes advanced features like Premium Read Aloud and Research Assistant.
Both plans are available with monthly, semester, or annual billing cycles.
We are an online textbook subscription service, where you can get access to an entire online library for less than the price of a single book per month. With over 1 million books across 1000+ topics, we’ve got you covered! Learn more here.
Look out for the read-aloud symbol on your next book to see if you can listen to it. The read-aloud tool reads text aloud for you, highlighting the text as it is being read. You can pause it, speed it up and slow it down. Learn more here.
Yes! You can use the Perlego app on both iOS or Android devices to read anytime, anywhere — even offline. Perfect for commutes or when you’re on the go.
Please note we cannot support devices running on iOS 13 and Android 7 or earlier. Learn more about using the app.
Yes, you can access NRM1 Cost Management Handbook by David P Benge,David Benge in PDF and/or ePUB format, as well as other popular books in Technology & Engineering & Construction & Architectural Engineering. We have over one million books available in our catalogue for you to explore.
PART 1
Introduction
CHAPTER 1
Cost management
Introduction
This chapter:
• defines cost management in the context of building projects;
• describes the basic principles of cost management;
• explains the importance of cost management;
• identifies the objectives of cost management;
• outlines the role of the cost manager;
• describes the cost management cycle phases along with the activities needed to complete them;
• explains the role that the RICS [Royal Institution of Chartered Surveyors] New Rules of Measurement: Order of Cost Estimating and Cost Planning for Capital Building Works (NRM 1) has in effective cost management;
• explains the relationship of the documents that comprise the RICS suite of new measurement rules;
• explains how NRM 1 supports building information modelling (BIM); and
• summarises the key benefits of the rules.
1.1 What is cost management?
Cost management is all about achieving value for money (VfM). It is much more than simply maintaining records of expenditure and issuing cost reports. Management means control, so cost management means all those actions necessary to understand why costs occur and the necessary responses so that decisions controlling costs are taken promptly – in light of all relevant information.
In the context of building projects, cost management involves the overall planning, co-ordination, control and reporting of all cost-related aspects from initiation to operation and maintenance. It is the process of identifying all costs associated with the investment, making informed choices about the options that will deliver best value for money and managing those costs, including costs throughout the life of the building, where whole life costs are being considered.
Cost management of building projects is just one of the specialist services undertaken by the quantity surveyor.
1.2 Basic principles of cost management
Cost management is one of the cornerstones of project management. The establishment and implementation of effective cost management procedures at an early stage in the development of a building project will help ensure success. Established and effective cost control systems and procedures, understood and adopted by all members of the project team, entail less effort than ā€˜crisis management’ and will release management effort to other areas of the building project.
The principle areas of cost management can be described as follows:
• Scope – defining what is to be included within the building project and limiting expenditure accordingly.
• Programme – defining the programme for the building project from inception to completion and ensuring compliance. Estimates and cash flow projections should be consistent with the programme.
• Design – ensuring that designs meet the scope and budget (i.e. cost limit); delivering quality that is appropriate to the employer’s brief.
• Risk allowances – ensuring that all monies are appropriately allocated from risk allowances and are properly authorised. Monitoring the use of risk allowances to forecast the cost limit.
• Contracts and materials – ensuring that the contracts provide full and proper control and that all costs are incurred as authorised; ensuring that materials are properly specified so as to meet the scope and design, and that they can be procured effectively.
• Cash flow – planning and controlling both commitments and expenditure within budgets so that unexpected cost overruns or underruns do not occur.
• Cost records and reports – ensuring that all transactions are properly recorded and authorised and, where appropriate, decisions are justified; and that regular, consistent and accurate reports are available to the employer.
It must be emphasised that cost management procedures need to be varied and flexible. Cost managers should discuss and jointly agree appropriate controls and review mechanisms with the employer and, where appointed, the project manager.
1.3 Why is cost management important?
Cost management is an essential part of effective programme/project management, but when poorly performed can be a barrier to the successful delivery of the building project and can result in failure to achieve value for money. Cost overruns are often caused by the employer through objectives that are unclear and changed during the course of the building project. The other main reasons for cost increases are:
• unrealistic cost estimates (usually too optimistic);
• risk allocation that is ambiguous; and
• inadequate management control.
In building projects, additional problems are frequently caused by:
• design that does not meet planning or statutory requirements;
• design that lacks co-ordination; and
• design that is difficult to build and maintain.
1.4 Objectives of cost management
The objectives of cost management are:
• to deliver the building project at the lowest cost compatible with the specified quality and as closely as practicable to the cost limit (taking account of whole life costs, where appropriate);
• to ensure that, throughout the building project, full and proper accounts are maintained (and kept up to date at all times) of all transactions including commitments, payments and changes; and
• to ensure that all transactions fully accord with the requirements of the employer or, in the case of public sector organisations, with the requirements of public accountability, probity and propriety.
1.5 Responsibility for cost management
The cost management of a building project is the joint responsibility of the whole project team; not the cost manager alone. Cost management requires continuing and active involvement from all project team members. Therefore, all project team members must remain mindful of their joint responsibility for cost management and draw to the attention of the employer, or project manager, anything that might affect cost. In view of this, it is important that the employer clearly sets out each consultant’s responsibility in respect of cost management in the consultant’s appointment.
1.6 The role of the cost manager
Management of the overall cost of the building project is the responsibility of the cost manager, maintaining effective financial control through the processes of evaluating, estimating, budgeting, monitoring, analysing, forecasting and reporting.
The main tasks of the cost manager are to:
• provide initial cost advice on capital investment costs;
• produce cost estimates and cost plans in respect of capital investment costs;
• advise on and estimate whole life costs;
• produce risk allowance estimates;
• manage the base cost estimate and risk allowance during design development and construction;
• undertake cost-in-use studies and option costs;
• produce cost reports, estimates and forecasts;
• maintain an up-to-date estimated outturn cost and cash flow;
• manage expenditure of the risk allowance;
• initiate action to avoid overspend;
• prepare pricing documents for the purpose of tender;
• evaluate tender bids;
• scrutinise actual cost of tenders;
• collect and analyse cost data;
• prepare interim valuations;
• value change instructions;
• ascertain cost implication of contractor’s financial claims;
• negotiate and agree final accounts; and
• issue financial reports or statements (i.e. throughout the building project to report the financial status).
1.7 The cost management cycle (the Benge Cycle)
The cost management cycle is shown in Figure 1.1. Proactive cost management takes place throughout the cost management cycle (the Benge Cycle). Each cost management cycle phase is described below, along with the activities needed to complete it.
Where required, whole life costs will be considered during each phase of the cost management cycle.
1.8 Relationship of the documents that comprise the RICS suite of new measurement rules
NRM 1 forms part of the RICS suite of publications referred to as the ā€˜new rules of measurement (NRM)’. The RICS Quantity Surveying and Construction Group have developed the NRM suite of documents. The primary aim of the rules is to provide a consistent approach to the measurement and quantification of capital building works and maintenance, supported by a common means of analysing cost data for future use.
Although the NRM suite has principally been based on UK practice, the requirements for a co-ordinated set of rules and their underlying philosophy have worldwide application.
The NRM suite comprises the following three volumes (summarised in Figure 1.2):
NRM 1 – Order of cost estimating and cost planning for capital building works;
NRM 2 – Detailed measurement for building works; and
NRM 3 – Order of cost estimating and cost planning for building maintenance works.
These rules are supported by the BCIS (Building Cost Information Service) ā€˜Elemental Standard Form of Cost Analysis, (NRM) Edition’, which sets out the principles of analysing building costs. Together, these rules deal with the quantification of buildings from ā€˜cradle to grave’ – from inception to demolition.
Image
Figure 1.1 The cost management cycle (the Benge Cycle)
Notes:
(1) Determining via...

Table of contents

  1. Cover Page
  2. Half Title Page
  3. Title Page
  4. Copyright Page
  5. Dedication
  6. Contents
  7. List of Figures
  8. List of Tables
  9. List of examples
  10. Foreword by Sean Tompkins
  11. Foreword by Richard Steer
  12. Foreword by Stuart Earl
  13. Preface
  14. Acknowledgements
  15. About the author
  16. Abbreviations
  17. Part 1 Introduction
  18. 1 Cost management
  19. 2 Cost estimating and cost planning
  20. Part 2 Order of cost estimates
  21. 3 Order of cost estimates – an overview
  22. 4 Commencing an order of cost estimate
  23. 5 Preparing an order of cost estimate
  24. 6 Computing the works cost estimate
  25. 7 Order of cost estimate – a worked example
  26. 8 Preparation of an initial elemental cost model – using the elemental method of estimating
  27. 9 Initial elemental cost model – a worked example
  28. Part 3 Cost planning
  29. 10 Cost planning – an overview
  30. 11 Format, structure and codification of cost plans
  31. 12 Preparing a cost plan
  32. 13 Quantification and the use of the tabulated rules of measurement for cost planning
  33. 14 Facilitating works (group element 0)
  34. 15 Substructure (group element 1)
  35. 16 Superstructure (group element 2)
  36. 17 Internal finishes (group element 3)
  37. 18 Fittings, furniture and equipment (group element 4)
  38. 19 Services (group element 5)
  39. 20 Prefabricated buildings and building units (group element 6)
  40. 21 Work to existing buildings (group element 7)
  41. 22 External works (group element 8)
  42. 23 Deriving unit rates for building components, sub-elements and elements
  43. 24 Calculating the building works estimate
  44. 25 Main contractor's preliminaries (group element 9)
  45. 26 Main contractor's overheads and profit (group element 10)
  46. 27 Calculating the works cost estimate
  47. Part 4 Estimating cost targets for non-building works items and risk allowances
  48. 28 Project and design team fees (group element 11)
  49. 29 Other development and project costs (group element 12)
  50. 30 Setting and managing risk allowances (group element 13)
  51. 31 Estimating the possible effects of inflation (group element 14)
  52. 32 Establishing the cost limit
  53. 33 Taxes and incentives
  54. Part 5 Writing cost estimate and cost plan reports
  55. 34 Reporting of cost estimates and cost plans
  56. Part 6 Designing pricing documents using NRM 1
  57. 35 Pricing documents
  58. Part 7 Analysing bids and collecting data using NRM 1
  59. 36 Analysing bids and collecting cost data
  60. Bibliography
  61. Index