Process Plant Piping
Practical Guide to Fabrication, Installation, Inspection, Testing, and Commissioning
Sunil Pullarcot
- 342 pages
- English
- ePUB (mobile friendly)
- Available on iOS & Android
Process Plant Piping
Practical Guide to Fabrication, Installation, Inspection, Testing, and Commissioning
Sunil Pullarcot
About This Book
This book is designed as a complete guide to manufacturing, installation, inspection, testing and commissioning of process plant piping. It provides exhaustive coverage of the entire piping spool fabrication, including receiving material inspection at site, material traceability, installation of spools at site, inspection, testing and pre-commissioning activities. In nutshell, it serves as a complete guide to piping fabrication and erection. In addition, typical formats for use in piping fabrication for effective implementation of QA/QC requirements, inspection and test plans, and typical procedures for all types of testing are included.
Features:
-
- Provides an overview of development of piping documentation in process plant design with number of illustrations
-
- Gives exposure to various codes used in piping and pipelines within its jurisdiction
-
- Quick reference guide to various applicable sections of ASME B 31.3 provided
-
- Coverage of entire construction contractors' scope of work with regard to plant piping
-
- Written with special emphasis on practical aspects of construction and final documentation of plant piping for later modifications/investigations
This book is aimed at mechanical, process and plant construction engineers/supervisors, specifically as a guide to all novices in the above disciplines.
Frequently asked questions
Information
Table of contents
- Cover
- Half Title
- Title Page
- Copyright Page
- Table of Contents
- About the Author
- Preface
- Chapter 1 Introduction
- Chapter 2 Piping Documents Development Process
- Chapter 3 Piping Isometric Drawings (Isometrics)
- Chapter 4 Piping Material Specification (PMS) and Material Take-Off (MTO)
- Chapter 5 Pipes
- Chapter 6 Pipe Fittings
- Chapter 7 Flanges, Gaskets and Fasteners
- Chapter 8 Valves
- Chapter 9 Sequence of Mechanical Works after Award of Work
- Chapter 10 Fabrication of Piping Spools
- Chapter 11 Non-Destructive Testing (NDT) of Piping
- Chapter 12 Preheat and Post-Weld Heat Treatment (PWHT) of Piping
- Chapter 13 Installation, Welding, Inspection and Testing of Piping Spools
- Chapter 14 Construction Documentation for Plant Piping (Mechanical)
- Chapter 15 Formats for Plant Piping Documentation
- Appendix A: Inspection and Test Plan (ITP) for Piping
- Appendix B: Welding Procedure Specification (WPS), Procedure Qualification Record (PQR) and Welder Qualification Record (WQR)
- Appendix C: Piping Progress Monitoring Based on Standard Point Factor
- Appendix D: Radiographic Acceptance Criteria for Rounded Indication
- Appendix E: Preheat and Post-Weld Heat Treatment Requirements as per ASME B 31.3
- Appendix F: Quality Audit of Piping Girth Welds Based on Radiography