
eBook - PDF
Pumping Capacity Upgrade for Chad-Cameroon Pipeline. Second-Generation Drag Reduction Agent (DRA) Technology
- 39 pages
- English
- PDF
- Available on iOS & Android
eBook - PDF
Pumping Capacity Upgrade for Chad-Cameroon Pipeline. Second-Generation Drag Reduction Agent (DRA) Technology
About this book
Project Report from the year 2021 in the subject Engineering - System Science, grade: 3.9, Limkokwing University of Creative Technology, language: English, abstract: This paper examines the idea of increasing the pumping capacity of the Chad-Cameroon pipeline system by using second-generation drag reduction agent (DRA) technology. Evidence shows that it is technologically feasible to upgrade the pipeline system to a capacity of 500,000 barrels per day (bpd) for the cost of $364.4 million. This capacity assumes the use of both the TOTCO and COTCO pipelines, the report also presents several lower capacities, and lower cost options. The upgrades will take at least 42 months to install and commission. The pipeline upgrade has numerous important strategic benefits that can help enhance the Chad-Cameroon pipeline's reputation as a more stable, and reliable oil producer in the world market.
In total, the Project would consist of approximately 664 miles of new, 36-inch diameter pipeline within the Chad and Cameroon. The proposed Project would have an initial capacity to deliver up to 500,000 barrels per day (bpd) of Doba's oil field from the proposed Komé crossing to existing oil terminals in Dompla and Belabo. Existing binding commitments for the Project amount to 250,000 bpd of crude oil and as demand for Chad-Cameroon pipeline oil increases, the pipeline would increase its load, up to its initial capacity of 500,000 bpd. The Project could ultimately transport up to 700,000 bpd of crude oil through the proposed pipeline upgrade by adding additional pumping capacity if warranted by future market demand.
The Project requires 18 new pump stations, 36 intermediate mainline valves (MLVs) of which 24 are check valves located downstream of major river crossings, approximately 50 permanent access roads and approximately 30 temporary access roads, one tank farm and two crude oil delivery sites.
Information
Table of contents
Trusted by 375,005 students
Access to over 1.5 million titles for a fair monthly price.
Study more efficiently using our study tools.
Frequently asked questions
Yes, you can cancel anytime from the Subscription tab in your account settings on the Perlego website. Your subscription will stay active until the end of your current billing period. Learn how to cancel your subscription
No, books cannot be downloaded as external files, such as PDFs, for use outside of Perlego. However, you can download books within the Perlego app for offline reading on mobile or tablet. Learn how to download books offline
Perlego offers two plans: Essential and Complete
- Essential is ideal for learners and professionals who enjoy exploring a wide range of subjects. Access the Essential Library with 800,000+ trusted titles and best-sellers across business, personal growth, and the humanities. Includes unlimited reading time and Standard Read Aloud voice.
- Complete: Perfect for advanced learners and researchers needing full, unrestricted access. Unlock 1.5M+ books across hundreds of subjects, including academic and specialized titles. The Complete Plan also includes advanced features like Premium Read Aloud and Research Assistant.
We are an online textbook subscription service, where you can get access to an entire online library for less than the price of a single book per month. With over 1.5 million books across 990+ topics, we’ve got you covered! Learn about our mission
Look out for the read-aloud symbol on your next book to see if you can listen to it. The read-aloud tool reads text aloud for you, highlighting the text as it is being read. You can pause it, speed it up and slow it down. Learn more about Read Aloud
Yes! You can use the Perlego app on both iOS and Android devices to read anytime, anywhere — even offline. Perfect for commutes or when you’re on the go.
Please note we cannot support devices running on iOS 13 and Android 7 or earlier. Learn more about using the app
Please note we cannot support devices running on iOS 13 and Android 7 or earlier. Learn more about using the app
Yes, you can access Pumping Capacity Upgrade for Chad-Cameroon Pipeline. Second-Generation Drag Reduction Agent (DRA) Technology by Yusuf Balarabe Abdullahi in PDF and/or ePUB format, as well as other popular books in Technology & Engineering & Construction & Architectural Engineering. We have over 1.5 million books available in our catalogue for you to explore.