A Practical Guide to the NEC4 Engineering and Construction Contract
eBook - ePub

A Practical Guide to the NEC4 Engineering and Construction Contract

Michael Rowlinson

Share book
  1. English
  2. ePUB (mobile friendly)
  3. Available on iOS & Android
eBook - ePub

A Practical Guide to the NEC4 Engineering and Construction Contract

Michael Rowlinson

Book details
Book preview
Table of contents
Citations

About This Book

Provides construction industry professionals with a practical and detailed guide to the NEC4 contract

The NEC contract takes a collaborative, project management based approach to construction projects, which is very different to the other standard forms of construction contract. This new edition of the book covers all changes in the 4th Edition of the Engineering and Construction Contract, issued in June 2017, and will provide practical guidance to help users transitioning from NEC3 to NEC4.

Inside A Practical Guide to the NEC4 Engineering and Construction Contract, readers will find chapters on the background of the NECECC; contract data and other documents; the'spirit of mutual trust'; all of the individuals involved in the process (eg: project managers, clients, supervisors, subcontractors, etc.); communication issues, early warnings and other matters; quality management; titles; dealing with timing; payment processes; cost components; compensation procedures and assessments; dealing with terminations; dispute resolution; completing the contract and more.

  • A practical guide to the application of the procedures contained in the newly issued NEC4 Engineering and Construction Contract
  • Provides detailed guidance on the use of the agreement, which is claimed to offer increased flexibility, improved clarity and greater ease of use
  • Written specifically for people actually using and administering the NEC contracts
  • Features 3 appendixes covering tables of clause numbers, case law and statutes; employer's, project manager's, supervisor's, contractor's and adjudicator's actions; and communication forms and their uses.

First launched in 1993, the NEC has become one of the UK's leading standard forms of contract for major construction and civil engineering projects, making A Practical Guide to the NEC4 Engineering and Construction Contract a must-have resource for any contractor using the latest version of this contract.

Frequently asked questions

How do I cancel my subscription?
Simply head over to the account section in settings and click on “Cancel Subscription” - it’s as simple as that. After you cancel, your membership will stay active for the remainder of the time you’ve paid for. Learn more here.
Can/how do I download books?
At the moment all of our mobile-responsive ePub books are available to download via the app. Most of our PDFs are also available to download and we're working on making the final remaining ones downloadable now. Learn more here.
What is the difference between the pricing plans?
Both plans give you full access to the library and all of Perlego’s features. The only differences are the price and subscription period: With the annual plan you’ll save around 30% compared to 12 months on the monthly plan.
What is Perlego?
We are an online textbook subscription service, where you can get access to an entire online library for less than the price of a single book per month. With over 1 million books across 1000+ topics, we’ve got you covered! Learn more here.
Do you support text-to-speech?
Look out for the read-aloud symbol on your next book to see if you can listen to it. The read-aloud tool reads text aloud for you, highlighting the text as it is being read. You can pause it, speed it up and slow it down. Learn more here.
Is A Practical Guide to the NEC4 Engineering and Construction Contract an online PDF/ePUB?
Yes, you can access A Practical Guide to the NEC4 Engineering and Construction Contract by Michael Rowlinson in PDF and/or ePUB format, as well as other popular books in Jura & Baurecht. We have over one million books available in our catalogue for you to explore.

Information

Year
2018
ISBN
9781119522546
Edition
1
Topic
Jura
Subtopic
Baurecht

1
Introduction

1.1 General

In writing this guide I have set out to provide a view, much of it personal, as to how to get the most out of the 4th Edition of the New Engineering Contract Engineering and Construction Contract (ECC). It is no secret that I am a fan of this suite of contracts and, as a result, may be willing to overlook what many perceive as it faults or weaknesses. In this guide I have tried to identify and suggest ways in which the procedures and aims of the contract can be simplified so that users do not become unnecessarily bogged down in procedure, but instead concentrate on achieving the goals of the ECC. This guide therefore goes through the procedure in detail as intended by the relevant clauses, but concentrates on practical issues to provide suggestions which the parties can use to achieve the overall intent and spirit of ECC and to reach the common goal.
With this guide, you get what it says on the cover: A Practical Guide to the NEC4 ECC Form of Contract. It is a guide to provide users of the ECC, both novice and experienced, with a view of all its various philosophies, principles, mechanisms and vagaries. The reader will be guided through the contract in a manner that will enable him or her to use this guide for reference without necessarily having to read it all: in other words, a practical guide rather than a stuffy textbook. That said, there will be an amount of cross‐referencing between sections in order to avoid repetition, so users will need to follow these references to find more detailed supporting guidance to particular issues. One area that is not cross‐referenced is the term ‘spirit of mutual trust and cooperation’ as found in clause 10.1 of the ECC, although used extensively throughout the guide. If users are uncertain of the meaning of this phrase, then they need to re‐read Chapter 4.
This version of the Guide follows on from the two editions of the same title but for the NEC3 edition of the suite of contracts. Many of the clauses remain the same in NEC4 as they were in NEC3, so both the processes and the practical guidance remain the same from one edition to the next. Nonetheless the publication of NEC4 introduced a significant amount of change to the ECC, all of which is considered and included in this version of the Guide. What this Guide does not do is identify or consider the changes from NEC3 to NEC4. It is written purely about NEC4.
To assist the reader in finding where any particular clause, related legal case or UK statute is referred to in the text, a comprehensive index of such references is included in Tables A1.1–A1.3 in Appendix 1.
The more I have worked with this suite of contracts over the years, the more I have come to think of it not as a contract but as a Project Management Procedures Manual. This should not be a surprise, as the original contract was drafted by project managers for construction professionals (and not by lawyers for other lawyers and judges).
Nevertheless, we must not lose sight of the fact that the ECC is a contract and, as such, legally binds those parties that enter into a contract incorporating these standard terms.
What I have also included in this Guide is advice and practical issues with regard to the NEC4 Engineering and Construction Subcontract. Except for some of the time periods being different and the absence of one main option, the Subcontract is truly back to back with the Contract. The differences are identified and additional practical issues are identified which apply to the Subcontractor/Contractor relationship. What users of the Guide will need to do in order to apply the majority of the text to the Subcontract is substitute the names of the parties and agents in the Contract with the equivalent names in the Subcontract. So ‘Client’, ‘Project Manager’ and ‘Supervisor’ in the Contract become ‘Contractor’ in the Subcontract. Similarly ‘Contractor’ in the Contract becomes ‘Subcontractor’ in the Subcontract, and ‘Subcontractor’ in the Contract becomes ‘Subsubcontractor’ in the Subcontract.

1.2 Mechanics not law

Being a practical guide, this book considers the mechanics of the contract and not the law. As a practicing construction professional, I am interested in the successful outcome of the project for all parties involved. From my point of view, the employing organisation should get what it wants in terms of a project finished on time, to the required quality and within budget (providing, of course, that the budget was reasonable in the first place). The consultants should be recognised for their contribution, whether it be design, management or commercially orientated, and be paid a reasonable fee for the service they provide. The contractors and subcontractors who carry out the work should be allowed to work efficiently, be recognised as having contributed to the project and make a profit.
Only those projects that satisfy all of the above criteria should be considered as being successful. Every organisation, whether it be a company, partnership or individual who is involved in a project, has its own needs and goals from that project. A good project will recognise this simple fact of business. It is when all the parties involved recognise each other's business goals (see Section 4.4.3) from the project, and work to align these goals, that success is achieved for all. As soon as one of the organisations involved feels dissatisfied, then the seeds of a dispute have been sown. As the industry knows, such seeds germinate easily and freely; once they appear on a project they can spread faster than any invasive weed.
Following on from the earlier editions, the ECC is drafted to impose the best practices within project management on the parties with the goal of avoiding disputes. It is the mechanics of these procedures and how to make them work effectively that is the focus of this guide.
As a consequence, the guide does not consider the law in relation to the ECC, except where reference is needed to explain why something is included or to confirm that, in relation to the law in the United Kingdom, those requirements have been complied with by the ECC (or not as the case may be).

1.3 A simple formula for understanding a contract

Let's face it: all contracts are confusing when you first try to work out what it all means. I picked up a simple formula for considering contracts many years ago from an experienced Chief Quantity Surveyor of a contracting organisation, who came to my then local centre of The Chartered Institute of Building to give an evening talk on Joint Contracts Tribunal (JCT) Contracts. It didn't matter that he was talking about JCT Contracts. What I took away from that talk was a formula that I still use today in relation to any contract or procedural document that I encounter; this formula holds good in all such situations. I still have the piece of paper on which I noted the few words I needed to remind me of what to do. I rarely look at that piece of paper now, as the formula has become second nature to me in relation to every contract or set of procedures I read.
The formula is in two parts. The first part can be remembered by four words: WHO, WHAT, WHEN and HOW.
To expand, a contract is a document that sets out the rights and obligations of the parties to that contract, no matter what the contract is for. In the construction and related industries such contracts cover (usually by necessity) a range of extensive rights and obligations for both parties, how such rights and obligations are to be administered, and the involvement of agents to carry out specified duties for one or both of the parties. WHO, the first of our four key words, relates to the administration of these rights and obligations. The WHO in the ECC will be one of the eight named persons including the Employer, the Project Manager, the Supervisor, the Contractor, the Senior Representatives, the Adjudicator, the Dispute Avoidance Board or the Tribunal. The specific roles of these individuals are covered in detail in Sections 5.2-5.9.
By its processes and procedures, the ECC sets out WHAT must or may be done in the event that a certain circumstance arises. The WHAT will involve the WHO doing something as set out in the contract.
WHEN that something is to be done is also set out by the contract. In the case of ECC, the timetable for WHEN these things shall be done is clear and forms a key part of the processes and procedures under the contract. Failure to comply with these processes and procedures in accordance with the requirements specified by WHEN can result in a right being forfeited because of this failure.
Finally, ECC sets out HOW the process or procedure shall be carried out. Again ECC is prescriptive as to the HOW, although much of the HOW is set out in general terms that apply across all of the subsequent detailed processes and procedures.
To summarise, the first part of the formula (which holds good for all contracts and not just the ECC) is to consider WHO does WHAT, WHEN they do it and HOW it is to be done. Understanding these things is important as ECC creates what are known in legal circles as conditions precedent. Although the English Courts do not like such provisions, they can be effective if drafted in certain terms (for further comment on conditions precedent see Section 1.5).
When dealing with specific processes and procedures in this guide, the WHO, WHAT, WHEN and HOW will be summarised as appropriate in each case.
These four key words were included by Rudyard Kipling in his short story ‘The Elephant’s Child', part of the Just So Stories, (1902) when he wrote:
“I keep six honest serving‐men
(They taught me all I knew);
Their names are What and Why and When
And How and Where and Who.”

1.4 Mandatory or discretionary

The second part of the formula I learnt that evening was to consider whether an obligation, requirement or procedure is mandatory or discretionary. The distinction is quite clear: if something is mandatory, then it must be done in order to create a right for you and/or an obligation on someone else. If something is discretionary, then the party concerned can do it if the party feels it is appropriate but loses nothing otherwise.
The key to whether something is mandatory or discretionary is in the little words. If a provision says that a party ‘shall’, ‘must’ or ‘will’ do something, then the requirement to do that something is mandatory; that key little word leave...