Construction Specifications Writing
eBook - ePub

Construction Specifications Writing

Principles and Procedures

Mark Kalin, Robert S. Weygant, Harold J. Rosen, John R. Regener

Buch teilen
  1. English
  2. ePUB (handyfreundlich)
  3. Über iOS und Android verfügbar
eBook - ePub

Construction Specifications Writing

Principles and Procedures

Mark Kalin, Robert S. Weygant, Harold J. Rosen, John R. Regener

Angaben zum Buch
Buchvorschau
Inhaltsverzeichnis
Quellenangaben

Über dieses Buch

Updated edition of the comprehensive rulebook to the specifier's craft

With this latest update, Construction Specifications Writing, Sixth Edition continues to claim distinction as the foremost text on construction specifications. This mainstay in the field offers comprehensive, practical, and professional guidance to understanding the purposes and processes for preparation of construction specifications.

This new edition uses real-world document examples that reflect current writing practices shaped by the well-established principles and requirements of major professional associations, including the American Institute of Architects (AIA), the Engineers Joint Contract Documents Committee (EJCDC), and the Construction Specifications Institute (CSI). Also included are guidelines for correct terminology, product selection, organization of specifications according to recognized CSI formats, and practical techniques for document production. Fully revised throughout, this Sixth Edition includes:

  • Updates to MasterFormat 2004, as well as SectionFormat/PageFormat 2007 and Uniformat

  • End-of-chapter questions and specification-writing exercises

  • Samples of the newly updated construction documents from the AIA

  • New chapter on sustainable design and specifications for LEED projects

  • Updated information on the role of specifications in Building Information Modeling (BIM)

Häufig gestellte Fragen

Wie kann ich mein Abo kündigen?
Gehe einfach zum Kontobereich in den Einstellungen und klicke auf „Abo kündigen“ – ganz einfach. Nachdem du gekündigt hast, bleibt deine Mitgliedschaft für den verbleibenden Abozeitraum, den du bereits bezahlt hast, aktiv. Mehr Informationen hier.
(Wie) Kann ich Bücher herunterladen?
Derzeit stehen all unsere auf Mobilgeräte reagierenden ePub-Bücher zum Download über die App zur Verfügung. Die meisten unserer PDFs stehen ebenfalls zum Download bereit; wir arbeiten daran, auch die übrigen PDFs zum Download anzubieten, bei denen dies aktuell noch nicht möglich ist. Weitere Informationen hier.
Welcher Unterschied besteht bei den Preisen zwischen den Aboplänen?
Mit beiden Aboplänen erhältst du vollen Zugang zur Bibliothek und allen Funktionen von Perlego. Die einzigen Unterschiede bestehen im Preis und dem Abozeitraum: Mit dem Jahresabo sparst du auf 12 Monate gerechnet im Vergleich zum Monatsabo rund 30 %.
Was ist Perlego?
Wir sind ein Online-Abodienst für Lehrbücher, bei dem du für weniger als den Preis eines einzelnen Buches pro Monat Zugang zu einer ganzen Online-Bibliothek erhältst. Mit über 1 Million Büchern zu über 1.000 verschiedenen Themen haben wir bestimmt alles, was du brauchst! Weitere Informationen hier.
Unterstützt Perlego Text-zu-Sprache?
Achte auf das Symbol zum Vorlesen in deinem nächsten Buch, um zu sehen, ob du es dir auch anhören kannst. Bei diesem Tool wird dir Text laut vorgelesen, wobei der Text beim Vorlesen auch grafisch hervorgehoben wird. Du kannst das Vorlesen jederzeit anhalten, beschleunigen und verlangsamen. Weitere Informationen hier.
Ist Construction Specifications Writing als Online-PDF/ePub verfügbar?
Ja, du hast Zugang zu Construction Specifications Writing von Mark Kalin, Robert S. Weygant, Harold J. Rosen, John R. Regener im PDF- und/oder ePub-Format sowie zu anderen beliebten Büchern aus Architecture & Conception architecturale. Aus unserem Katalog stehen dir über 1 Million Bücher zur Verfügung.

Information

Verlag
Wiley
Jahr
2011
ISBN
9781118174388
Chapter 1
The Role of Specifications
Documents for Construction
When an Owner decides to build, renovate, or reconstruct a facility, the Owner usually engages others to prepare documents describing the Work to be performed and the contractual requirements under which construction and related administrative activities are accomplished. Contemporary construction practices in North America are varied, and construction contracts likewise express varied contractual relationships, procurement (bidding and negotiation) methods, and regional construction practices.
This complexity can be very confusing, so, for the purposes of this book, the discussion will be generally limited to the context of the traditional design-bid-build method for construction procurement, with comments occasionally describing alternative procurement methods, such as design-build, multiple prime contracts, and phased (“fast track”) construction. Also, the discussion will be in the context of three primary parties in the construction contract: the Owner, the Architect/Engineer, and the Contractor.
The Architect or Engineer, and his or her various consultants, prepare documents for construction of the facility. These develop over time, from conception of the design through gestation of design development, through the birth pangs of bidding/pricing and construction, until delivery of the completed facility at closeout of the construction Contract. Many types of documents are used during design and construction, but for actual construction three basic types of documents are used:
1. Bidding and Contract Requirements: Text documents
2. Drawings: Graphic documents
3. Specifications: Text documents
Combined, these three types of documents are called the Bidding Documents (before signing of the Agreement or “contract”) and the Contract Documents (after signing the Agreement or contract). The difference concerns when the documents are used. Prior to execution (signing) of the Agreement, the combined documents are known as Bidding Documents under traditional design-bid-build projects. Under design-build and certain types of construction management-type projects, the documents prior to execution of the Agreement may be known as “Procurement Documents.” This is a fine distinction reflecting the process of negotiation for selection of product vendors and subcontractors, but in most cases, even under design-build and construction management-type projects, a competitive bidding process is used. So, “Bidding Documents” will be the term used here for the documents prior to execution of the Agreement. After execution of the agreement, the documents are known as the Contract Documents.
Bidding Documents
“Bidding documents” is a term generally used to describe the documents furnished to bidders. For traditional design-bid-build projects, the Architect/Engineer and Owner prepare the set of Bidding Documents, consisting of bidding requirements, Drawings, and Specifications. These are issued to prospective general contractor bidders for competitive bidding and for the Owner to select the Contractor named in the Agreement and referenced in other Contract Documents.
However, there are projects where the Contractor is selected by a method other than competitive bidding, such as direct selection by the Owner based on qualifications of the Contractor. In such cases, competitive bidding still occurs but it is managed by the Contractor, who issues Bidding Documents and manages the bidding process.
The primary difference in documents between Bidding Documents and Contract Documents is the inclusion in the Bidding Documents of Bidding Requirements. These generally consist of the Advertisement or Invitation to Bid, the Instructions to Bidders, the Bid Form, and other documents to be submitted to the Owner for the Owner's selection of the Contractor and modifications to the documents issued during bidding (addenda). The Bidding Requirements are removed after bidding and selection of the Contractor and are replaced by the Contract Requirements. The Contract Requirements typically consist of the executed (signed) Agreement with its related documents, such as insurance forms, bonds, and certifications. Note: the Bidding Documents typically include copies of the Agreement form and the Conditions of the Contract (General Conditions and Supplementary Conditions when industry-standard documents are used). The bidding process is described further in Chapter 8.
As noted above, two other types of documents are included in the Bidding Documents and the Contract Documents: the Drawings and the Specifications. This book will not describe principles and practices for production of the Drawings but will describe the types of information best presented on the Drawings (graphic presentation) and in the Specifications (text presentation), and the discussion will include coordination issues between the Drawings and the Specifications. Chapter 2 discusses the relationship between the Drawings and the Specifications in greater detail.
Contract Documents
“Contract Documents” is the term used for documents identified in the Agreement (construction Contract). It appears simple, but, of course, these documents can become complicated as the project delivery process becomes more complex and the relationships between the parties involved in the project become more varied and obscure. Considering the typical design-bid-build project, the Contract Documents consist of the following:
  • Agreement —A written agreement between the Owner and the Contractor summarizing the work to be performed, the Time in which the Work shall be completed, and the Contract Sum to be paid. Also identified in the Agreement are the Contract Drawings, the Contract Specifications, and other referenced documents such as bond forms, insurance certificates, other certifications, Contractor's qualifications statement, documentation of the Contractor's financial status, subcontractors and suppliers lists, special warranty documents, and just about any other type of written document that the Owner requires. Note: the Agreement is typically prepared by the Owner's legal and insurance counsels or by the Construction Manager if one is involved in the project. The Architect/Engineer typically does not prepare the Agreement and its attachments. If the Architect/Engineer is involved in producing the Agreement and its attachments, it should be under the direction of the Owner. Architects and engineers are not trained to produce legal instruments (documents) and insurance documents, nor are they licensed to practice law and insurance underwriting.
  • Conditions of the Contract—Typically, these consist of the General Conditions and the Supplementary Conditions. General Conditions are typically preprinted standard documents prepared by professional societies such as (for architectural projects) the American Institute of Architects (AIA) and (for engineering projects) the National Society of Professional Engineers (NSPE), American Consulting Engineers Council (ACEC), and American Society of Civil Engineers (ASCE). Together, the listed engineering societies jointly publish documents as the Engineers Joint Contract Documents Committee (EJCDC). The Conditions of the Contract are discussed in greater detail in Chapter 9.
  • Drawings—Graphic descriptions of the Work to be performed by the Contractor. The content of Drawings and the relationship between the Drawings and Specifications are discussed in greater detail in Chapter 2.
  • Specifications—Written descriptions of the Work to be performed by the Contractor. The types of Specifications, their content, and specification writing principles and practices are discussed in greater detail below and in Chapters 5, 6, and 7.
  • Modifications—Architect's Supplemental Instructions (for contracts based on AIA A201, General Conditions of the Contract), Field Orders (for contracts based on EJCDC C-700, General Conditions of the Contract), Construction Change Directives (for contracts based on AIA A201, General Conditions of the Contract), Work Change Directives (for contracts based on EJCDC C-700, General Conditions of the Contract), and Change Orders (for contracts based on both AIA and EJCDC General Conditions of the Contract). “Modifications” are changes to the documents after execution (signing) of the Agreement. Prior to execution of the Agreement, changes are generally made using Addenda. Addenda and Contract Modifications are discussed in greater detail in Chapter 13.
Often the term “construction documents” is used as a synonym for “Contract Documents.” This is incorrect. Simply stated, the Contract Documents are the documents identified in the Agreement. The Contract Documents, together with other documents used during construction, may be called construction documents. Contractually, this is a fine but important distinction. The Contractor, the Architect/Engineer, and the Owner are only obligated to perform according to the Contract Documents. Other documents may be required by the Contract Documents to be produced and used during performance of the Work under the Contract, including shop drawings, construction schedules, construction reports, meeting notes, submittals, installation instructions, test reports, permits, and certificates from authorities having jurisdiction, and operating and maintenance data. However, these are not Contract Documents, although most should become part of the “contract record documents,” which describe the completed Work of the Contract and which may be used by the Owner for operation and maintenance purposes.
Specifications
Imagine a movie or video presentation of the construction of a building, park, water or sewage treatment plant, refinery, highway, or bridge. Imagine that all the activities of construction are shown in great detail, from procurement of materials and manufactured products, through fabrication, delivery to the job site, storage and staging on the job site, surface preparation, mixing, application, installation, fitting, and finishing. Also imagine the Owner, the Architect/Engineer, the Contractor's managers and supervisors, the subcontractors, the testing and inspection agency personnel, the manufacturers’ representatives, and code authorities meeting and discussing matters related to the construction. Imagine the movie or video presentation without a sound track. There is not only no background music, there is no dialog. It would be very difficult to construct the facility based only on a silent movie. To properly understand the requirements and construct the facility, dialog is essential.
The relationship between the Contract Drawings and the Contract Specifications is equivalent to this dialog. The Contract Specifications are essential for complete understanding of the Work to be performed...